ALL PRO USA was contracted by a contractor to document the pre-construction conditions of the Rubin Museum. The reason that we were called in for this was the Reconstruction of the Barney’s Department store. Where they were adding 4 stories to the store that was already there. The owners of the museum asked for this documentation to ensure that nothing was damaged within the museum throughout the modifications being added above the Department Store. Prior to the start of construction the Rubin Museum, in Manhattan, required the contractor to bring a third party independent company to provide video and photo documentation of the pre-construction conditions of several areas of the museum. These areas included Exterior Facade, Rooftop Water Towers, utility rooms, Elevator Shaft Walls, boiler room, interior floors, interior walls, interior ceilings, stairwells, and general viewing and exhibit areas including the artifacts. This project took multiple visits to complete as the Rubin Museum has four floors of exhibits plus the basement and rooftop. It was completed over a two week period in the spring of 2017.