Upgrades to Existing Water Lines, St. Clair Shores, Michigan, May 2019

St. Clair Shores, Macomb County, Michigan Upgrades to existing water lines Pre-Construction Video May 2019   This project only required construction video, we did not have to complete construction photography. To complete this project All Pro USA was asked to document road surfaces, businesses and residences that fell within the contractors scope of work. The town that the project focused on was that of St Clair Shores, Michigan which is apart of Macomb County. The […]
April 15, 2020

Bronson, Michigan Pre-Construction Video, October 2019

Bronson,  Branch County, Michigan and Sturgis, St. Joseph County, Michigan Road Work Pre-Construction Pre-Construction Video March 2020   This project only required construction video, we did not have to complete construction photography or utilize the drone for construction video. We were brought on to complete this job for the Michigan Department of Transportation (MDOT). This project required All Pro USA to document the roads along the proposed path of the project. This project started in […]
April 22, 2020

Forbes Road Storm Sewer Improvement,
Pre-Construction Video and Photography – March 2020

Vincennes, Knox County, Indiana Water Line Pre-Construction Video and Photography March 2020   We have done projects in Indiana and other states for the past five years with several contractors. This project required ALL PRO USA to document the streets along the proposed path of the project. The streets that we had to cover were Forbes Road, Ridgeway Avenue, Margaret Street, and McKinley Avenue. 
April 29, 2020

230kv Capitol Grid Takoma Substation to Harvard Substation – March 2020

Washington D.C. 230kv Capitol Grid Takoma Substation to Harvard Substation Video and Photography March 2020 We have done projects in Washington D.C. and other cities for the past five years with several contractors. This project required ALL PRO USA to document the entirety of the proposed project path by the contractor. They would be connecting two substations in Washington D.C. that would cover about 73 blocks. When it was all said and done covering both […]